< Previous— Post Houston p/ 40 2023 ADDITIONAL PROJECT PHOTOS — THROUGHOUT THE ENTIRE SITE 04p/ 41 Case Study — Synergi LLC— Post Houston p/ 42 2023 The theater hall, as seen at the Grand Opening for the rejuvenated space, is depicted on the right. ADDITIONAL PROJECT PHOTOS CAPTURED THROUGHOUT THE SITE 04 THEATER HALL Z STAIRp/ 43 Case Study — Synergi LLC Synergi installed exterior guardrail that includes surface mounted, anodized aluminum posts with continuous top rail and stainless steel webnet infill. THE O STAIR IN THE MARKET HALL THE ROOFTOP SKYLAWN— Post Houston p/ 44 2023 THE Z STAIR IN THE THEATER HALLp/ 45 Case Study — Synergi LLCp/ 47 Case Study — Synergi LLC The “Z stair” guardrail includes clear, laminated tempered glass with SGP interlayer and aluminum glazing shoe. THE Z STAIR IN THE THEATER HALL Synergi’s work includes the glass guardrail at the overlook and on the wood-clad “Z stair” in the theater atrium.Synergi LLC www.synergillc.comNext >