Location: New York, NY
Architectural Partners: Vocon Architects
General Contractor: HITT Contracting
This project involves the renovation of an existing space with new slab cut outs for 4 new feature stairs designed using Synergi’s design assist process. Synergi developed a custom gantry on the roof to lift the C-channel stringers into the building in one piece eliminating the need to modularize the stringers and removing joints which would have been visible through the blackened finish.